Updated: 30 September 2026

Gladia Heights location and East Saigon infrastructure

The new address is Binh Trung Ward, Ho Chi Minh City — before 2025 it was Binh Trung Dong Ward, Thu Duc City. Travel times and the infrastructure projects named in the project documents.

Master plan of the 60-ha Gladia by the Waters township on the Rach Chiec river

Address and legal name

ItemDetails
Commercial nameGladia Heights
Legal project nameKhu nhà ở phường Bình Trưng Đông, thành phố Thủ Đức (Binh Trung Dong Ward Housing Area, Thu Duc City — now Binh Trung Ward, Ho Chi Minh City)
AddressVo Chi Cong road frontage, Binh Trung Ward (former Binh Trung Dong Ward, Thu Duc City), Ho Chi Minh City
TownshipGladia by the Waters — a 60-ha integrated township on the Rach Chiec river
High-rise zone1.26 ha: 616 apartments and 23 commercial units
Setback from Vo Chi Cong road73.7 m

Travel times

DestinationTime (indicative)
Thu Thiem International Financial Centreabout 10 minutes
Phu My Hungabout 10 minutes
Ba Son bridgeabout 15 minutes
Ben Thanh market (former District 1 centre)about 20 minutes
Tan Son Nhat and Long Thanh airportsexpected about 30 minutes once the metro lines operate

Times from the project documents, by car in free-flowing traffic; rush hours may take longer.

Infrastructure under way and planned

ProjectScalePlanned milestoneLegal basis
My Thuy interchange4 levels, VND 3,600 billionTarget completion Q3/2026Decision 715/QĐ-UBND, 30/01/2026
HCMC – Long Thanh – Dau Giay expressway widening8 – 10 lanes, VND 15,337 billionStarted 19/8/2025, expected completion Q4/2026Decision 575/QĐ-VEC, 04/06/2025
Ring Road 3about 76 km linking HCMC, Dong Nai and Tay NinhFull opening expected Q4/2026Resolution 57/2022/QH15
Long Thanh International Airportabout 5,000 ha, nearly USD 16 billionPhase 1 operations expected December 2026Notice 299/TB-VPCP, 05/05/2026
Cat Lai – Phu Huu port road5.9 km, 60 m right-of-way, 12 lanesStart Q4/2026, completion Q4/2028Resolution 08/NQ-HĐND, 06/02/2026
Vo Chi Cong road widening8.3 km, 67 m right-of-way, 12 lanes, VND 5,500 billionStart 2027, completion 2030Decision 1711/QĐ-TTg (2024)
Metro Line 6 (inner ring)about 53.8 km, routed along Vo Chi CongPhase 1 (Tan Son Nhat – Phu Huu) expected to start in 2026Resolution 188/2025/QH15
Thu Thiem – Long Thanh railway42 kmProposed start 2026, completion 2030Resolution 188/2025/QH15

Milestones are the plans stated in the project’s sales documents, citing government documents; actual progress may change. Happy Land does not guarantee infrastructure timelines.

Inside the 60-ha Gladia by the Waters township

The Gladia Heights towers sit next to Vo Chi Cong road at the entrance to the township. Beyond them are the low-rise zones The Grand, The Grace and The Posh along the Rach Chiec river, where more than 400 villas and townhouses have been handed over and are lived in.

The master plan shows a Welcome Park, Wellness Park, Riverside Park, Riverfront Plaza, Community Park, Family Park, a clubhouse and a plot for education. High-rise residents may use the public areas that the developer hands over to the state.

Get the live inventory and unit documents

Message Happy Land on WhatsApp or Zalo for the list of remaining units, a price calculation for the payment plan you choose, detailed floor plans per unit code and the handover checklist — free of charge.

Frequently asked questions

Which ward is Gladia Heights in after the 2025 reorganisation?

Binh Trung Ward, Ho Chi Minh City. It was previously in Binh Trung Dong Ward, Thu Duc City, and the legal project name still refers to “Binh Trung Dong Ward, Thu Duc City”.

How long does it take to get to Thu Thiem?

About 10 minutes by car to the Thu Thiem International Financial Centre and about 20 minutes to Ben Thanh market, according to the project documents (indicative, traffic permitting).

Is there a metro station near Gladia Heights?

Not yet. Metro Line 6 is planned along Vo Chi Cong road, with phase 1 (Tan Son Nhat – Phu Huu) expected to start in 2026 according to the project documents. This is a plan and timing may change.

Is the building close to the main road and noisy?

The towers are set back 73.7 m from Vo Chi Cong road. Once the Cat Lai – Phu Huu port road is complete (planned for Q4/2028), container trucks from the port are expected to go straight to Ring Road 3 instead of using Vo Chi Cong.

Zalo